Sign In | Join Free | My components-electronic.com
components-electronic.com
Products
Search by Category
Home > Plastic & Rubber Machinery >

800kg/H HDPE Jacket Pipe Extrusion Line For Pre Insulated Pipe

Categories Pre-Insulated Pipe Production Line
Brand Name: Huashida
Certification: ISO9001
Place of Origin: Qingdao,Shandong,China
MOQ: 1
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Delivery Time: 7workdays
Packaging Details: according to the actual condition
specification: PE-960
Main extruder: 150
Pipe diameter (mm): 960
capacity (kg/h): 800kg/h
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

800kg/H HDPE Jacket Pipe Extrusion Line For Pre Insulated Pipe

Vacuum Calibrating Method Flexible Pre-insulated Pipe line,high safety

Product Description

gas/oil /water pipeline Puf Pre-Insulated Pipe PE shell casing plastic Machinery


HDPE Jacket pipe extrusion line for pre-insulated pipe is designed by Qingdao Huashida Machinery Co., LTD. It absorbs and improves developed HDPE pipe extruding technology.

The production line is an integration design composed by extrusion, vacuum calibrating, cooling, pulling, cutting, stacker. Great performance in automatic operation, extrusion capacity, steady and service life etc. Especially compared with the line use internal pressure method, vacuum calibrating method is much better than it for stiffness, pressure resistance and surface smooth.Vacuum calibrating method pre-insulation pipe outside casing extruded line is the advanced and popular machinery in the world.

Technical Prameters:

PE-365/760PE-420/960PE-850/1372PE-960/1680
Main extruderSJ-90/33SJ-90/33SJ-120/33SJ-150/33
Pipe diameter (mm)Φ365-960Φ420-960Φ850-1372Φ960-1680
capacity (kg/h)550-700550-700700-900800-1200
Installed power (kw)360380440580
Length (m)35364048


HDPE Jacket Process Flow:

Vacuum feeding PE granule-->hot air dry material-->extrusion plasticizing-->mold shaping-->Vacuum sizing-->water cooling-->Pulling out-->cutting pipe-->carrier laying-off pipe

Composition of Equipments:

1.hopper dryer ⒉ Single Screw Extruder ⒊ extrusion mould die ⒋ Head bracket ⒌ Vacuum calibration device ⒏ Water cooling tank ⒐ haul-off ⒑ Planetary cutting machine 11.Pipe bracket ⒓. Loader 13. PLC

PU Foaming Pre-insulated Pipe Production process Flow:

The production process of "pipe in pipe" (PU Foaming Pre-insulated Pipe) mainly includes three steps: surface pretreatment of steel pipe, production of HDPE outer protective pipe and production of insulation layer.


Piping PUF insulation and fittings is a rigid structure "pipe in pipe" consisting of steel or galvanized steel carrier pipe, a layer of polyurethane foam insulation and the outer jacket pipe protective of high-density polyethylene - for underground installation or sheet galvanized steel - for above-ground pad.

Rigidity due to the presence of strong ties between the steel pipe layer polyurethane insulation and jacket pipe and provides pre-shot blast or blast cleaning the surface of the steel pipe, optimum performance polyurethane insulation, corona surface of polyethylene pipe shell.

gas/oil /water pipeline Puf Pre-Insulated Pipe PE shell casing plastic Machinery Advantages:
Significantly increases the reliability of the pipeline in the PUF insulation system operational availability of remote condition monitoring PUF insulation, which allows to detect and repair leaking coolant, preventing accidents typical for thermal networks of other designs.
Highly cost-effective use of pipelines in the foam insulation define the following parameters:
Simplifying the construction, maintenance and repair;
Increased service life of 30-40 years (traditional types of pipelines - 5-10 years);
Reduction of heat losses to 8% (traditional types of pipelines - 30-40%);
Reducing capital costs by 15-20% (not required construction of concrete channels and chambers for valves);
Reduced operating costs by 9 times;
Reduction in repair costs 3 times.

Quality 800kg/H HDPE Jacket Pipe Extrusion Line For Pre Insulated Pipe for sale
Send your message to this supplier
 
*From:
*To: Qingdao Huashida Machinery Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0