Sign In | Join Free | My components-electronic.com |
|
Categories | CNC Machined Components |
---|---|
Brand Name: | Kingrui |
Model Number: | KR007 |
Certification: | ISO9001: 2008 |
Place of Origin: | Dongguan, China( Mainland) |
MOQ: | 1 Pcs |
Price: | Negotiable |
Payment Terms: | T/T 50% as deposit 50% before shipment |
Supply Ability: | 1200-1500 units per month |
Delivery Time: | Normally, simple parts,5- 7 workdays, complicated parts 7- 15 workdays, according QTY and the complexity of drawing. |
Packaging Details: | PE film covered first, Plastic box, then carton last. |
Comcoment Name: | Precision Grinding Processing CNC Machined Components WIth Material Proof |
Comcoment Material: | S7 from America or custom |
Material Brand: | AISI |
Shaping Mould: | Plastic injection mould |
Design Sofeware: | Auto CAD, UG |
Drawing format: | PDF. DXF. DWG and more |
Cnc Machining Parts Precision Grinding Processing WIth Material
Proof
Introiduction of CNC machined component
1. Material: S7, The tool steel is made of chromium molybdenum alloy, which is specially designed for the special properties of high impact resistance and toughness, and has the characteristics of easy processing and several heat treatment. Die steel S7 is suitable for hot working and cold working impact tools and plastic moulds.
2. Machining: This CNC machined component, Be processed by two processes, Namely, precision grinding and precision Sodick EDM.
3. Machined Equipements: Japan mitsubishi mirror EDM machine, surface grinder. And in our factory, there are other processing equipments, such as:
4. Surface finish: For surface treatment, we list as follows:
5. Applied software: Pro/ E, Auto CAD 2000, solid work 2001, CAXA, UG, CAD, CAM
In short, any 2D and 3D format is acceptable
6. Product weight: according to your drawings.
Relevant Specifications of CNC Machined Components
Item Name | Precision Grinding Processing CNC Machined Components WIth Material Proof |
Part Machining | Customized is welcomed, welcome to send your drawings any time. |
Materials | SKD61, SKH51, PD613, DC53, HPM4, M4, M2, S7, 1.2344, 1.2343, SUS440B, SUS33 |
Size | Per your drawings |
Surface Finish | Zinc Plating, Nickel Plating, Chrome Plating, Passivation, Hardening, High Frequency, Clear Anodizing, Black Anodizing, Black Oxide Coating, Degreasing, Brushing, custom is available |
Precision |
|
Inspection | Microscope / Micrometer / Projector / High Gage / Roughness Tester etc. |
Part Color | According to customer’s demand, or the color of the metal itself |
Certificate | ISO9001: 2008 |
MOQ | 1PCS |
Price | We can discuss |
Lead Time | Within 5-15 working days, we promise to arrange the production reasonably and observe the delivery date. |
Different Surface Treatment Instructions
Black Oxide | Parts have been heat-treated for hardness, which results in a dark surface color. |
Zinc Plated | Parts have a protective coating that adds corrosion resistance for outdoor use. |
Nickel &Chrome Plating | Parts have a protective coating that adds corrosion resistance with beautiful look |
Clear&Black Anodizing | corrosion resistance with beautiful look also very light, Aluminum material use most. |
Brushing | Generally, the stainless steel material will make brushing look |
Delivery
1, We have cooperation with China Post, DHL, UPS, FEDEX, EMS and so
on, we may give you some advice of transportation.
China Post: For the package under 2kgs, Usually need 25-35days to
get the package.
SHL, UPS, Fedex IE: For the package over 2kgs. If the package is
under 20kgs, Shipping cost will be little high, For the package is
over 20kgs, these express will be more economic.
Usually need 5-9days for the packages can be arrived. Tracking
number can be offered after the package be sent out(for some
country and area, It has remotes and contacted with us to check
your area to check, for the remotes will cost remotes fee)
EMS: Most safety shipping way, Usually need 7-10 days to get the
package.
Fedex IP: Most fast shipping way, Usually need 2-5 days to get the
package, Especially for USA customers. Just 2-3 days to get the
package. But cost little high.
2, If the order is big, we usually suggest you to use Air Freight,
please inform us the nearest airport or port, we can help you check
the best cost before shipment.
3, During or near to the Holidays and Festival, as so many packages
be stucked at the customs, some packages will be delayed for few
days, please kindly understand this.
4, All of the balance need to be paid before the shipment or bill
of leding.
![]() |