Sign In | Join Free | My components-electronic.com |
|
Categories | LED Light Kit |
---|---|
Place of Origin: | Guangdong, Mainland China |
Brand Name: | LF |
Certification: | ISO9001:2008, TS16949 |
Model Number: | LF-DJ |
MOQ: | 500 PCS |
Price: | Negotiable |
Packaging Details: | Part in Bubble Bag, then in Cartons, Wooden Pallet on Bottom, Film wrapped overall then Nylon belt fastened Or to be Customized Means of Packing. |
Delivery Time: | MOQ 2 Weeks, 10,000pcs+ : 4 Weeks. |
Payment Terms: | TT, L/C, D/P, Western Union |
Supply Ability: | 30,000 PCS Per Month |
Company Info. |
LiFong(HK) Industrial Co.,Limited |
Verified Supplier |
View Contact Details |
Product List |
Black Anodize Aluminum Led Housing Die Cast Parts For Stage / Mine Light
Description:
Large Image: Aluminum Led Housing For Mine
Aluminum Led Heat Sink for Stage
Big Powder Lampholder
Die Casting Lampholder
Application:
Stage Led Housing
Specification:
Overall Dimension | L220mm*W210mm*H70mm |
Surface Treatment | Black Anodic Oxidation |
Part Weight | 3947.4 Gram |
Material | A380 (Standard: ASTM B 85-03 Standard ) |
Processing Technic:
1. Die Casting Tooling Making--Prototype/T1--Dimension Check-- Sample Approval-- SOP
2. Die Casting-- Remove Water Gap--Deburring-- Machining--Dilling Holes/ Threading-- Quality Check (dimension and surface) --Powder Coating--QC (Surface Vision Checking)-- Packing
High Quality Outside Usage Powder Coating surface makes very good performance in Oxidation Resistance And Corrosion Resistance.
Die Casting Workshop
2000T Die Casting Machine
Machining Workshop
Advantages:
1. Professional Research and Design Team (20 Persons), Possess All Necessary Equipments.
2. Strict Quality Control in Each Process and Finish Product Quality Control
3. Short Delivery Lead Time: 15-30 Days
4. Optional For OEM or ODM
5. Comprehensive After-Sale Service, Quick Responses For Daily Communication
![]() |