Categories | Water Well Drilling Rig Machine |
---|---|
Brand Name: | ShiTan |
Model Number: | XY-1A |
Certification: | ISO9001 |
Place of Origin: | China |
MOQ: | Negotiation |
Price: | Negotiation |
Delivery Time: | Within 7-12 days |
Payment Terms: | L/C, D/A, T/T, Western Union |
Packaging Details: | exported packing |
Product Name: | XY-1A 150 Meters Water Well Drilling Rig |
Drilling depth: | 150 Meters |
Drilling Hole Diameter: | Customized |
Features: | Easy operation / free maintaining |
Type: | Core Drilling Rig |
Power Type: | Diesel |
Usage: | Water Well |
Voltage: | 220v |
Drilling angle: | 90-75° |
Place of origin: | China,Hebei |
After sale service: | Video Support |
Company Info. |
Jinzhou City Shitan Machinery Equipment CO. LTD. |
Verified Supplier |
View Contact Details |
Product List |
XY-1A 150 Meters Water Well Drilling Rig Borehole Depth With
Compact Structure
Product Description
XY-1A Core Drilling Rig is a light type machine at high speed with
hydraulic feeding.Compact structure, small volume, lightweight,
high detachability, easy transportation and suitable for the
operations in plains or mountain areas.
Product Main parameters
Parameter | |
Drilling depth | 150--180m |
Drill rod caliber | 50 42mm |
End hole caliber | 75 46mm |
Max. open hloe caliber | 220mm |
Drilling angle | 90°~75° |
Drill weight (No include power) | 610kg |
Unity machine dimensions | 2.1×0.9×1.3m |
Spindle | |
spindle speed | 130, 300, 480, 730, 830, 1045r/min |
Spindle stroke | 450mm |
Hoist | |
Max.single line hoisting capacity | 1600kg |
Single line lifting speed | 1.06, 0.67, 0.32m/s |
Wirerope caliber | 13mm |
Wirerope cubic measure | 35m |
Hug floodgate caliber | 254mm |
Hug folldgate belt width | 50mm |
Distance between drill and hole | 230mm |
Mud pump | |
Type | Horizontal single urn twin-action |
Displacement | 170L/min |
Maximum pressure | 1.5Mpa |
Work pressure | 0.7Mpa |
Power | |
Diesle engine | S1105 18HP |
Electric motor | Y160M—4 15KW |
Product Main Features
a. the highest speed can reach 1045r/min, improving drill
efficiency
b. 53 x 59 drilling rod adopted, high rigidity and strong delivery
torque.
c. the machine is equipped with national patent technology---taper
clutch, with charactristics of strong transmission troque, easy
operation and free maintenance.
d. for the winch, we use large module planetary gear and add
supporting frame, greatly increasing hoisting and braking ability
of the winch.
e. Vertical spidle are fixed by four groups of bearings to ensure
that the rotary machine is rigid enough for gravel layer and other
complex geoloical conditions.
Product Applications
XY-1A drilling rig is mainly used for geological general
investigation and exploration, road and tall buliding foundation
exploration, kinds of hole in concrete structure, river
levees,earth temperature central air-conditioner,etc;Core mining
exploration, Or exploration;Small hole diameter water well
drilling;Geothermal pipe-installing for heat pump;Small-diameter
hole foundation piling drilling.
How do the drillers replace the bit?
During drilling, the power of the drilling rig drives the rotary
table, Kelly, drill pipe and drill bit to rotate. Observe the
working condition of the down hole drill bit through the
instruments on the ground of the drilling rig. After comprehensive
judgment, if the drill bit is considered to have been worn, stop
drilling immediately and replace the drill bit. After the drilling
is stopped, the drilling fluid circulation shall be maintained for
a period of time. The purpose is to adjust the performance of the
drilling fluid, bring the rock cuttings suspended in the drilling
fluid out of the ground, circulate to keep the new borewell wall
stable, and conduct routine inspection of the drilling equipment.
The driller uses the crown block, traveling block and hook on the
derrick to pull out all drilling tools from the well according to
the height of the derrick and the column (usually composed of two
or three drill pipes). After pulling out, the drill pipe column is
discharged into the derrick in sequence. While lifting the down
hole drill string, the drilling fluid shall be continuously
injected into the annular space with the drilling pump to keep the
liquid level in the borewell from falling, so that the pressure in
the borewell can balance the formation pressure, so as to prevent
the borewell from collapsing or the fluid in the down hole
formation from entering the borewell. At the same time, pay special
attention to the possible sticking of the drill pipe due to the
wall shrinkage, and the operator shall strictly control the lifting
speed. After all the drill pipes and drill collars in the borewell
are pulled out, the drill bits to be replaced will be pulled out at
the same time. The workers can resume drilling after unloading the
old drill bits, installing new drill bits and lowering them into
the well according to the original column sequence.