Categories | Self Climbing Formwork |
---|---|
Model Number: | QPMX-50 |
Place of Origin: | Beijing, China (Mainland) |
Brand Name: | ZULIN |
Certification: | ISO9001-2008 |
Price: | Negotiation |
MOQ: | One 20ft container |
Delivery Time: | After deposit 15-20 days |
Payment Terms: | T/T L/C (bank transfer) |
Supply Ability: | 100sets/day |
Packaging Details: | In bulk,pallet,bundle or according the customer demand |
Company Info. |
Beijing Zulin Formwork & Scaffolding Co., Ltd. |
Verified Supplier |
View Contact Details |
Product List |
Auto Independent Self Climbing Formwork with Forward or Backward
Inclination QPMX-50
Descrition:
The lifting power of the Formwork QPMX-50 comes from its hydraulic
system, which includes the oil cylinder
and commutator. Through functioning of hydraulic system, the steel
rail and bracket can climb up alternately,
so the whole formwork system climbs steadily, independent of a
crane. It' s easy to operate, and climbing is fast
and safe.
Structure :
The Characteristics
1. One oil cylinder unit can lift 50KN.
2. The QPMX-50 system can climb not only vertically but also
slantwise, and the forward or backward inclination
can be up to 18 degrees.
3. The system can climb up wholly or separately. The climbing
process is steady, synchronous and safe.
4 .The bracket does not come back to the ground until construction
work is finished, and spacing for work is
reduced while the bumping damage is almost completely prevented, especially
for the plywood.
5.The error of structure construction is tiny and easy to correct.
6.The formwork can climb up by itself and cleaning work can be done
in situ. The number of crane lifts are
greatly reduced.
Standard Climbing Process
1.Set up the formwork by wall-through tie-rods and pull-push props,
embed anchors and do the first concrete
pouring.
2. Remove the formwork after the first pouring and fix anchor shoes
on the finished wall, lift the brackets and
formwork to the right position, match the formwork and do the second
pouring.
3.Lift formwork and brackets to the higher floor; fix climbing rail
and hydraulic system.
4.Match the formwork to the right position and do the third
pouring.
5.Strip the formwork and fix anchor shoes on the finished wall,
then let the climbing rails climb.
6. Brackets climb up to the right position, then install suspended
platform.
7.Match the formwork, do the concrete pouring, and proceed into the
standard climbing stage.
Illustration of Verticle Climbing
Sketches of inclined climbing |
Project Application
| |||
Contractor:CSCEC | |||
Applications:
|